How it works

  • Architectural Product

    M.R. Wall’s "puzzle" pieces are delivered to the construction site.

    1
  • Puzzle pieces

    The subcontractor lays out the puzzle pieces.

    Perfectly cut CNC puzzle pieces enable edges to connect without visible seams.

    2
  • Installation

    The 60 foot high wall is prepped for installation with taped drywall and scaffolding.

    3
  • Stack

    30 unique M.R. Wall puzzle pieces stack on top of each other creating an iconic 3d textured wall surface.

    4